logo
Thuis Nieuws

bedrijfsnieuws over Modular Cleanroom Commissioning: Step-by-Step Guide to Successful System Startup

Certificaat
China KeLing Purification Technology Company certificaten
China KeLing Purification Technology Company certificaten
Klantenoverzichten
Keling had met succes ons na producten op 25 Oct.2017 tegen Portugal NO.M170807 geleverd; Hun geleverde Luchtfilters hebben naar genoegen sinds installatie gewerkt. Wij zijn tevreden met hun producten.

—— SIMPOR PHARMA

Aangezien wij coopertae met hen doen, bieden zij altijd goede kwaliteit aan en houden op tijd de levering aan ons, doen wij appreicated voor hun vriendelijke steun!

—— Nasir

Dit moet verklaren dat wij u-type de tunnel van de luchtdouche, Luchtdouche en HEPA-filter, Secundaire luchtfilter, perfilter voor ons project van KeLing-Co. Ltd, de de Handels Vierkante, Medio Bouw van 3C01 Tian Feng, Nr 133, Baiyun AV, Baiyun Disctrict, Guangzhou, Guangdong, China van de Reinigingstechnologie tegen Contract Nr kochten: 2014/4119005942 in 22 Oktober, 201

—— IATEC, Argentinië

Het product kwam sneller aan dan verwacht en zij verzonden iets speciaal naast tot wat ik opdracht gaf. De personen van Nice en de snelle dienst!

—— Mohammed Saad

Ik ben online Chatten Nu
Bedrijf Nieuws
Modular Cleanroom Commissioning: Step-by-Step Guide to Successful System Startup
Modular Cleanroom Commissioning: Step-by-Step Guide to Successful System Startup

Commissioning a modular cleanroom is a rigorous, multi-phase process that validates every component performs to design specifications, ensuring regulatory compliance and operational reliability. Unlike traditional construction, modular systems offer advantages in faster validation due to factory-tested components, but require meticulous planning to integrate all systems seamlessly.

Pre-Commissioning Preparation

Before any testing begins, a comprehensive pre-commissioning checklist ensures all foundational elements are in place. This includes verifying correct installation of modular wall panels, ceiling grids, and flooring systems, with proper alignment and gasket sealing. Utility connections—electrical, plumbing, and compressed air—are pressure-tested and leak-checked. HVAC systems undergo preliminary airflow balancing, with each fan filter unit (FFU) run continuously for 72 hours to stabilize performance. Documentation reviews confirm all equipment has valid calibration certificates and material safety data sheets (MSDS) are on file.

Environmental Performance Testing

The core of cleanroom commissioning focuses on validating environmental controls. Particle counting tests measure airborne contaminants using calibrated laser counters at multiple heights and locations, ensuring compliance with ISO classification standards (ISO 14644-1). Temperature and humidity mapping uses data loggers placed strategically throughout the space, verifying uniform conditions within ±0.5°C and ±2% RH of setpoints. Pressure differential testing confirms proper cascade relationships between zones, with differential pressures maintained at ≥12.5 Pa between adjacent cleanroom classifications.

Operational System Validation

Modular cleanrooms rely on integrated systems that must function harmoniously. Air change rate tests calculate ventilation effectiveness by measuring tracer gas decay times, ensuring sufficient air exchange rates meet industry standards. Filter integrity tests (DOP/PAO) challenge HEPA/ULPA filters with aerosolized particles to detect leaks, critical for maintaining sterile conditions. Alarm systems are triggered intentionally to verify proper notification protocols, and emergency shutdown procedures are tested to ensure safe de-energization of equipment.

Bartijd : 2026-07-10 15:29:58 >> Nieuwslijst
Contactgegevens
KeLing Purification Technology Company

Contactpersoon: Mrs. Zhao

Tel.: 86 20 13378693703

Fax: 86-20-31213735

Direct Stuur uw aanvraag naar ons (0 / 3000)